The Tasmanian Shed Approval Checklist

What to confirm before you buy, pour a slab, or build. Work through both parts. Planning approval through council, and the category of building work, are two separate checks.

Your progress0 of 9

Want a copy to take to your council? Get the downloadable pack.

Part 1. Planning approval (council)

Whether you can build on this site, and under what conditions.

✓
Confirm your property's zoning and what it allowsYour council can confirm the zone and any siting conditions for a shed.
✓
Check whether any overlays apply to your siteBushfire, landslip, coastal inundation, coastal erosion, flood-prone, and heritage overlays can each change what is required.
✓
Confirm boundary setbacks for your zoneHow far the structure must sit from each boundary.
✓
Check easements and site coverageEasements can restrict where you build. Site coverage limits how much of the block can be covered.
GURU TIP

There is no link between planning approval and the category of building work. Needing one does not automatically mean you need the other. Treat them as two separate checks.

Part 2. Building approval (category of work)

How the structure must be approved and built.

✓
Work out the likely category of your workTasmanian building work is grouped into categories from low risk through to permit work. The category sets the approval path.
✓
Confirm the structure is engineer-designedAsk your supplier for the engineer's design documentation for the structure and its components.
✓
Check whether council must be notified on completionSome work requires the council to be notified once finished, with the relevant form lodged.
✓
Factor in your site conditionsSlope, soil, cut and fill, and access can all affect the build and which requirements apply.

Getting the right help

The single step that protects everything above.

✓
Ask the right questions of any shed supplierCheck qualifications, accreditation, warranty, permit assistance, and contract before you commit. The takeaway pack below includes our supplier questions guide.

Want a copy to take to your council?

Get the full checklist as a PDF to take to your council, plus our bonus guide to the questions to ask any shed supplier.

  • The Tasmanian Shed Approval Checklist (PDF)
  • Bonus: Questions to Ask Any Shed Supplier (PDF)

We'll send the pack and occasional shed guidance. Unsubscribe any time.

Not sure which category your shed falls into?

We'll match you with a vetted Tasmanian builder.

theshedguru.com.au/enquiries
This checklist summarises general requirements drawn from the Building Act 2016 (Tas), the Director's Determination on Categories of Building and Demolition Work, and the National Construction Code. It is a starting point, not formal advice, and does not cover every situation. Requirements depend on your site, your structure, and your council. Always confirm your circumstances with your local council, a building surveyor, and your builder.